Overall dimensions
Record finished width, height and depth, plus the clear space above the vanity. Check door swing against side walls, lights, tapware and shower screens.

Shortlist mirrored storage by wall opening, cabinet depth, door layout and required features, then verify the exact model, electrical configuration, installation method and available documents with your importer and project team.
Content owner: ArcQuay Product & Project Team ·
Australian projects use “shaving cabinet” for several product types, from a simple mirrored storage cabinet to an illuminated model with additional electrical features. Define the configuration before comparing documentation or price.
Record finished width, height and depth, plus the clear space above the vanity. Check door swing against side walls, lights, tapware and shower screens.
Clarify surface-mounted or recessed intent, wall construction, fixing zones and the finished opening. Recessed installation needs early coordination with framing and services.
Compare door divisions, internal shelves, usable depth and access. Note where hinges, power components or plumbing zones may affect storage.
Identify lighting, demister, sensor, outlet or other functions separately. Do not assume a feature shown on one cabinet applies to another size or configuration.
Use the live product page for initial dimensions and features, then request the current model-level drawing, electrical information and commercial specification needed for your project or import review.
There is no blanket approval statement that safely covers every shaving cabinet. The buyer or responsible supplier should identify the actual equipment and confirm applicable Australian requirements with the relevant consultant, regulator and licensed installer.
| Configuration | Information to request | Local review |
|---|---|---|
| Non-illuminated mirrored cabinet | Model drawing, cabinet and mirror specification, weight, fixing points, shelf and hinge details | Builder or installer confirms wall support, clearances and suitable fixing method |
| Illuminated cabinet | Exact voltage and frequency, wiring arrangement, component list, labels and available model-specific electrical documents | Importer or responsible supplier confirms equipment obligations; a licensed electrician reviews connection and installation |
| Cabinet with outlet, demister or sensor | Feature-specific schematic, ratings, instructions and documents tied to that size and option set | Do not transfer evidence from a visually similar model; confirm the ordered configuration |
| Cabinet coordinated with basin or tapware | Separate product codes and documents for any plumbing products in the package | Check whether the particular plumbing product requires a WaterMark listing; the cabinet name alone does not answer this |
Minimum order quantity, price and timing depend on the selected model, options, quantity and approval status. Request them after the technical scope is clear.
List room types, widths, quantities, destination and target dates.
Compare cabinet formats and required features through the live category.
Review wall opening, depth, door swing, vanity alignment and services.
Match electrical or plumbing evidence to the exact configuration.
Confirm drawings, finish, sample needs, labels and installation information.
Use approved codes and checkpoints for packing and shipment records.
No. Features vary by model and size. Use the product page as a starting point and request confirmation of the ordered cabinet’s lighting, demister, sensor, outlet or other functions.
Do not assume it can. Electrical evidence should identify the relevant product or configuration, and plumbing product requirements apply to the actual component being supplied. The importer should verify scope and current acceptance.
Provide the cabinet schedule, wall and vanity dimensions, surface or recessed mounting, required features, project location, quantities, drawings, target programme and the document list requested by your consultant or importer.
ArcQuay can organise the first model and document review once the room schedule and intended Australian supply configuration are clear.